Project Description

Planning-level cost estimates for the 2040 LRTP were developed for each mode, including roadway, bicycle, pedestrian, and transit using the 2015 LRE Costing Tool provided by FDOT District One. The cost assumptions and resulting cost estimates were used in the development of the 2040 LRTP Needs Plan and Cost Feasible Plan.